Our expert site engineers supported an essential project in Towcester, Northamptonshire.
Location:
Towcester, East Midlands, UK
Project duration:
Since June 2023 (ongoing)
Main work scope:
- Construction of civil base for Temporary SAF units (4 no. of SAF units) and a temporary collection tank.
- Installation of temporary SAF units.
- Installation of temporary collection.
- Modification of flooring on existing PSTs outlet chamber and installation of D/D Submersible pumps to pump flow to two SAF lanes.
- Installation of temporary SAF effluent return pumps in the temporary collection tank to return effluent from SAF units to PSTs outlet chamber during seeding period.
- Installation of temporary ducts to SAF units.
- Installation of temporary below-ground SAF effluent pipework section to avoid obstruction of access to the construction area for permanent solution.
- Installation of temporary overground hose for SAF feed rising main, SAF effluent main, anoxic recycle main, SAF effluent pipework to filter outlet chamber.
- Installation of generator with fuel storage to power the temporary equipment until the power supply from existing MCC (Motor Control Centre) to the temporary equipment is sorted.
- Crane pad for lifting SAF units in place.
Site engineer responsibilities:
- Collaborating with Hercules Site Services PLC and Anglian Water
- Project planning and coordination
- Site management, quality control and safety
- Setting out and verifying positions
- Supervising infrastructure integration
- Reporting and documentation
- Logistics and resource management
Stakeholders:
- Anglian Water
Additional details:
- At EASE, our engineers work collaboratively with the client.
- Our engineer, Karl, is an integral part of the management team on this project and is helping to deliver the highest standards.
Testimonial
Currently we are delivering a circa £2.5million scheme on behalf Anglian Water/@One alliance. E.A.S.E have played a key role in the ongoing successful delivery of this project. They have supported us with a high caliber of engineering resource throughout. Their support has helped us achieve our right first time principals through excellent and timely setting out, implementation of the BIM model and thorough QA checks and documentation.
E.A.S.E have on several current schemes embedded themselves within our delivery teams and come highly recommended.