EASE Ltd Nav Background
EASE Ltd Nav Background
wind turbines

Share story

31/07/2024

Monopile Manufacturing Facility

Our highly skilled site engineers supported the construction project for the world’s largest monopile manufacturing facility for offshore wind turbines.

Project Duration:

From October 2022-December 2023

Project Goal:

Ground stabilisation for constructing the world’s largest monopile manufacturing facility.

Main Work Scope:

  • Ground stabilisation using pre-bore rigs, CFA rigs, and casement pile rigs.
  • Installation of over 6,000 piles, which form the foundation of the manufacturing facility.

Site Engineer Responsibilities:

  • Collaborating with Bauer and Keller to operate piling rigs.
  • Setting out and verifying pile positions.
  • Conducting as-built surveys of pile locations.
  • Completing daily reports on pile installations.

Other Stakeholders:

  • SeAH Wind: The main client for the monopile manufacturing facility.
  • K2 Construction Management: Overseeing project management and coordination.
  • Bauer: Providing piling rigs and expertise.
  • Keller: Specialising in ground engineering and pile installation

Additional Details:

  • The facility aims to manufacture monopiles for offshore wind turbines.
  • The project represents a significant investment in renewable energy infrastructure in the UK.

Share story

More
Case Studies

The flexibility and support received from the EASE management team were second to none, ensuring the project's needs could always be met.

EASE performed well throughout, quickly integrating themselves and ensuring the data could be collated and checked efficiently, punctually and, most importantly, safely.

Sam Cawthorne - Keller

Testimonial Section Lines Background